Skip to main content

Gloucester lift bridge is opened

The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme. The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting d
July 12, 2012 Read time: 1 min
The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme.

The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting deck.

DavyMarkham was contracted by civil engineering contractors Alun Griffiths to design and manufacture the mechanical, hydraulic and electrical elements of the bridge, notably the main pivot bearings, the deck operating system, tail locking assemblies and electrical control equipment. The bridge deck, supplied separately by structural steelwork company Rowecord, measures 28m long by 16m wide and weighs around 200tonnes, with an additional concrete and steel 100tonne counterweight in the tail section.

Related Content

  • Float positioning for Bandra Worli Bridges
    May 29, 2024
    In Mumbai, India, two steel bridges have been barged to site and then lifted into position as part of the Mumbai Coastal Road-Bandra Worli Sea Link project.
  • Wirtgen slipform paver works in Brazil road contract
    May 15, 2015
    Local contractor Galvão Engenharia opted to use an SP 850 slipform paver from Wirtgen as one of the key machines in the job to upgrade and improve the Anel Viário de Fortaleza. This important highway connects Fortaleza, located in the federal state of Ceará, with the busy port of Pecém. The deepwater port in Pecém is some 60km from Fortaleza and since it was inaugurated in 2002, the city has become a primary port for exporting fruit products in refrigerated containers. Fuel and liquefied gas, fertilizer
  • Balfour wins US-70 upgrade in North Carolina
    February 14, 2023
    Balfour is already involved in the US-70 Havelock Bypass and US-70 James City projects.
  • Major improvements for wheeled loaders and excavators
    April 24, 2013
    Excavators and wheeled loaders benefit from new engine technology - Mike Woof reports. Competition is tough in the market for crawler excavators and wheeled loaders. These production machines account for a significant percentage of the entire construction equipment market worldwide and the segment also has the widest array of competing manufacturers. In the past, European, Japanese and US manufacturers dominated this sector but in the last 20 years South Korean companies have built significant market shares