Skip to main content

Gloucester lift bridge is opened

The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme. The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting d
July 12, 2012 Read time: 1 min
The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme.

The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting deck.

DavyMarkham was contracted by civil engineering contractors Alun Griffiths to design and manufacture the mechanical, hydraulic and electrical elements of the bridge, notably the main pivot bearings, the deck operating system, tail locking assemblies and electrical control equipment. The bridge deck, supplied separately by structural steelwork company Rowecord, measures 28m long by 16m wide and weighs around 200tonnes, with an additional concrete and steel 100tonne counterweight in the tail section.

Related Content

  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Kwikform composite bridge formwork solution
    February 27, 2012
    Composite bridge specialist falsework, Paraslim, from RMD Kwikform is being used to construct a viaduct and rail over-bridge in Wales. Paraslim is supporting the £35 million (US$55.7 million) A487 Porthmadog, Minffordd and Tremadog Bypass constructed by a joint venture partnership of Balfour Beatty and Jones Bros Civil Engineering UK.
  • Mersey Gateway Project reaches half-way point across the Mersey
    March 10, 2017
    The Mersey Gateway project in England has passed a significant milestone, with over half of the main bridge deck stretching across the River Mersey. Work to install stay cables on the main bridge also passed a key point, with installation of the 31st 150m long cable – the halfway point for stay cable installations on the pylon. When complete, 146 stay cables will support the 1km-long reinforced concrete bridge, with a combined load-bearing weight of more than 53,000tonnes. “We’re now more than 50