Skip to main content

Gloucester lift bridge is opened

The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme. The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting d
July 12, 2012 Read time: 1 min
The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme.

The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting deck.

DavyMarkham was contracted by civil engineering contractors Alun Griffiths to design and manufacture the mechanical, hydraulic and electrical elements of the bridge, notably the main pivot bearings, the deck operating system, tail locking assemblies and electrical control equipment. The bridge deck, supplied separately by structural steelwork company Rowecord, measures 28m long by 16m wide and weighs around 200tonnes, with an additional concrete and steel 100tonne counterweight in the tail section.

Related Content

  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Bermuda bridges being built
    December 6, 2017
    Bridges will be built in Bermuda, following the award of the design contract to a UK team comprising Ramboll, Knight Architects and Eadon Consulting. The deal was awarded by the Government of Bermuda and is for full design services for two replacement highway bridges. The two bridges form key links for Bermuda’s transport infrastructure, connecting L F Wade International Airport with capital city Hamilton to the west and St Georges to the east. Longbird Bridge was originally constructed in the 1950s as a
  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro