Skip to main content

Gloucester lift bridge is opened

The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme. The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting d
July 12, 2012 Read time: 1 min
The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme.

The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting deck.

DavyMarkham was contracted by civil engineering contractors Alun Griffiths to design and manufacture the mechanical, hydraulic and electrical elements of the bridge, notably the main pivot bearings, the deck operating system, tail locking assemblies and electrical control equipment. The bridge deck, supplied separately by structural steelwork company Rowecord, measures 28m long by 16m wide and weighs around 200tonnes, with an additional concrete and steel 100tonne counterweight in the tail section.

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • First bridge deck section joined on UK’s Mersey Gateway project
    June 30, 2017
    The Mersey Gateway bridge project near Liverpool in England passed a milestone recently with the first joining of two of the deck sections.
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Major bridge widening project going to plan
    April 11, 2012
    When built it was determined that a vital US road/rail bridge would always be widened. Work on that huge project is going to plan as Patrick Smith reports One of the biggest bridge widening projects in the world is being carried out under an ambitious development programme. At US$1.2 billion, the seven-year scheme to widen the Huey P. Long Bridge in the US state of Louisiana is also the largest of 16 projects planned under the state's TIMED (Transportation Infrastructure Model for Economic Development)