Skip to main content

Gloucester lift bridge is opened

The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme. The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting d
July 12, 2012 Read time: 1 min
The newly-opened High Orchard Bridge in Gloucester, south-west England, links the city's inner relief road to the new south-west bypass and provides access to the massive Gloucester Quays €293.5 million redevelopment scheme.

The lift bridge structure was designed and constructed under a joint venture involving English Partnerships, British Waterways and developer Peel Holdings. The €11.74 million structure is a contemporary single-span bridge, with an efficient electro-hydraulic movable, 300tonne lifting deck.

DavyMarkham was contracted by civil engineering contractors Alun Griffiths to design and manufacture the mechanical, hydraulic and electrical elements of the bridge, notably the main pivot bearings, the deck operating system, tail locking assemblies and electrical control equipment. The bridge deck, supplied separately by structural steelwork company Rowecord, measures 28m long by 16m wide and weighs around 200tonnes, with an additional concrete and steel 100tonne counterweight in the tail section.

Related Content

  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
  • Sennebogen builds its largest duty cycle crawler crane, the 6300
    March 14, 2016
    Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
  • Sennebogen builds its largest duty cycle crawler crane, the 6300
    January 6, 2017
    Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev