Skip to main content

German autobahn project

Construction work is due to commence shortly in Germany on the upgrades to the A8 autobahn in the south of the country.
February 28, 2012 Read time: 1 min
Construction work is due to commence shortly in Germany on the upgrades to the A8 autobahn in the south of the country. The improvements include widening the autobahn to six lanes between Augsburg-West and Neu-Ulm. The project is being carried out under the public private partnership model and the work is due for completion on 30th September 2015. The 41km long autobahn upgrade is expected to cost in the order of €305 million.

Related Content

  • Myanmar elevated expressway project
    September 21, 2018
    Discussions are being held in Myanmar with regard to the country’s Elevated Expressway Project. The Myanmar Government has been in talks with the International Finance Corporation (IFC). The project is expected to cost US$400 million, with work due to commence in 2019 and likely to require 24-36 months to complete. Building the 24km expressway will improve transport between the north and south of Yangon City. The project will be carried out under the PPP model, with IFC advising on the work.
  • UK smart motorway work for M4 link
    September 16, 2019
    Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
  • Recycling used for German road expansion project
    April 20, 2018
    A milling machine from Bomag has been carrying out an important portion of the work needed for a four-lane expansion of a busy route in Southern Germany Widening work has been carried out on the B85 route from Amberg to Pittersberg in Bavaria to boost its capacity. The 2.6km section was prioritised as being in urgent need of improvement by the Federal transport Ministry. Construction work commenced in mid-2017, starting with preparation works and the project includes a cloverleaf interchange to connect t
  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.