Skip to main content

Funds released to repair Skagit Rover Bridge in Washington State

Some US$15.6 million in federal emergency funds is being made available to Washington State to help repair the Interstate 5 bridge over the Skagit River, which collapsed on May 23rd 2013. The funds were released by US Transportation Secretary Ray LaHood. A section of the four-lane bridge, located around 100km north of Seattle, collapsed into the water, disrupting travel in both directions. This funding follows $1 million in quick release emergency relief provided the day after the collapse. The Washington
June 19, 2013 Read time: 2 mins
Some US$15.6 million in federal emergency funds is being made available to Washington State to help repair the Interstate 5 bridge over the Skagit River, which collapsed on May 23rd 2013. The funds were released by US Transportation Secretary Ray LaHood.  A section of the four-lane bridge, located around 100km north of Seattle, collapsed into the water, disrupting travel in both directions. This funding follows $1 million in quick release emergency relief provided the day after the collapse. The 914 Washington State Department of Transportation (WSDOT) will use the funds to build a new replacement span. In the interim, WSDOT continues to operate detours and is building a temporary bridge. When the new replacement span is complete, WSDOT will remove the temporary bridge and install the new span. The bridge carries around 71,000 vehicles/day and is a major commercial route between Washington and neighbouring Canada. Approximately 11% of the vehicles are trucks transporting goods between the two countries. A full report into the bridge collapse has yet to be completed but questions remain as to whether the incident was caused by an over-height vehicle that struck a key structural member, causing sufficient damage for the section of the bridge to give way. The bridge also faces questions over the bridge’s long term future. This type of structure is no longer considered suitable for the traffic volumes and types of vehicles it is expected to carry.

For more information on companies in this article

Related Content

  • Young Driver Risk
    April 16, 2018
    Police in the US state of Ohio recently found themselves in a high-speed pursuit involving a vehicle taken without its owner’s consent. The chase lasted for around one hour and the vehicle hit speeds of up to 160km/h during the pursuit, which covered a distance of around 72km in all between Cleveland and Milan. Officers managed to box the car in and bring it to a halt, without anyone being injured. The driver was a 10-year-old boy who took his mother’s car, the second time that the lad had done this in just
  • Replace bridge for Vancouver’s Massey Tunnel could aid congestion
    December 21, 2015
    Opponents of a proposed 10-lane bridge near Vancouver, Canada, said the structure will encourage urban sprawl in a region that is already struggling with a booming population. The British Columbia provincial government recently opened the final round of public consultation for the planned 3.3km toll bridge likely to cost around US$2.54 billion.
  • Briefly, and to the point
    May 9, 2012
    The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods. Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures. The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If neces
  • Austria's new tunnel meets safety regulations
    July 13, 2012
    New safety regulations and high traffic volumes require new tunnel construction all across Europe. Mike Woof reports Anew highway tunnel now being built in Austria will boost traffic volumes and safety standards on a key European route. The existing Pfänder Tunnel lies close to Austria's borders with Germany and Switzerland and carries a heavy traffic volume, so a new parallel tunnel is under construction to help spread this load, increasing capacity as well as safety. Stringent tunnel safety standards have