Skip to main content

Funds released to repair Skagit Rover Bridge in Washington State

Some US$15.6 million in federal emergency funds is being made available to Washington State to help repair the Interstate 5 bridge over the Skagit River, which collapsed on May 23rd 2013. The funds were released by US Transportation Secretary Ray LaHood. A section of the four-lane bridge, located around 100km north of Seattle, collapsed into the water, disrupting travel in both directions. This funding follows $1 million in quick release emergency relief provided the day after the collapse. The Washington
June 19, 2013 Read time: 2 mins
Some US$15.6 million in federal emergency funds is being made available to Washington State to help repair the Interstate 5 bridge over the Skagit River, which collapsed on May 23rd 2013. The funds were released by US Transportation Secretary Ray LaHood.  A section of the four-lane bridge, located around 100km north of Seattle, collapsed into the water, disrupting travel in both directions. This funding follows $1 million in quick release emergency relief provided the day after the collapse. The 914 Washington State Department of Transportation (WSDOT) will use the funds to build a new replacement span. In the interim, WSDOT continues to operate detours and is building a temporary bridge. When the new replacement span is complete, WSDOT will remove the temporary bridge and install the new span. The bridge carries around 71,000 vehicles/day and is a major commercial route between Washington and neighbouring Canada. Approximately 11% of the vehicles are trucks transporting goods between the two countries. A full report into the bridge collapse has yet to be completed but questions remain as to whether the incident was caused by an over-height vehicle that struck a key structural member, causing sufficient damage for the section of the bridge to give way. The bridge also faces questions over the bridge’s long term future. This type of structure is no longer considered suitable for the traffic volumes and types of vehicles it is expected to carry.

For more information on companies in this article

Related Content

  • US highway bill
    August 13, 2012
    After long delays the US Government has finally signed its highway reauthorisation bill. “This is a good, bipartisan bill that will create jobs, strengthen our transportation system and grow our economy,” said US transportation secretary Ray LaHood. “It builds on our safety efforts. The bill also provides states and communities with two years of steady funding to build the roads, bridges and transit systems they need.” Funds for transportation projects will come from the Highway Trust Fund as well as genera
  • The Sir Ambrose Shea lift bridge wins key award
    April 25, 2017
    The Sir Ambrose Shea lift bridge has received a transportation award of merit. The structure was designed by Parsons and has been given the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario (CEO). As sole prime consultant, Parsons also provided project management and engineering services during construction. Located on the Avalon Peninsula in the town of Placentia, NL, the Sir Ambrose Shea Lift Bridge provides a connection while supporting the region’s commercial fishing industry.
  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b