Skip to main content

Fugro wins 3-year pavement assessment contract with UK council

Fugro has secured a three-year contract with Luton Borough Council in southern England to provide a range of highway and footway investigations, including the Council’s annual SCANNER surveys using Fugro’s ARAN (Automatic Road Analyser) survey system. The survey package also includes SCRIM (surface friction) testing of Luton’s A, B and C roads, and CVI (coarse visual inspection) of unclassified roads. Cambridge-based Fugro transport specialists will process the survey data to generate NI (national indicator
December 13, 2012 Read time: 2 mins
One of the Luton roads which will come under the remit of Fugro’s pavement assessment contract with the southern English town’s borough council
6202 Fugro has secured a three-year contract with Luton Borough Council in southern England to provide a range of highway and footway investigations, including the Council’s annual SCANNER surveys using Fugro’s ARAN (Automatic Road Analyser) survey system.

The survey package also includes SCRIM (surface friction) testing of Luton’s A, B and C roads, and CVI (coarse visual inspection) of unclassified roads. Cambridge-based Fugro transport specialists will process the survey data to generate NI (national indicator) reports, and provide results which can be used to visualise the condition of the road network.

The contract also allows Fugro to consult on and implement Footway Network Surveys (FNS). Fugro says this will help council engineers to assess and report footway condition and asset values in response to the government’s transport infrastructure asset codes.

Luton’s highways team can access additional information on road network construction by utilising ground penetrating radar (GPR) data automatically collected by the ARAN survey vehicles.

Initially running until May 2015, Fugro’s contract with Luton Borough Council has a two-year extension option.

For more information on companies in this article

Related Content

  • Weigh in motion and ANPR techology aid highway protection
    April 10, 2012
    Weigh-in-motion technology manufacturers have been involved in a number of significant highways tolling projects across the world in recent months, while others are looking to become involved in major new initiatives. Guy Woodford reports. The continuing global economic crisis did not prevent UK-based TDC Traffic Systems from recently securing the prized US$2.84million (€2.14million) contract to supply 20 high speed weigh-in-motion (WIM) systems for overweight pre-selection and enforcement in Saudi Arabia
  • A pothole damage breakthrough?
    April 11, 2013
    Academic research by two universities in the same UK city shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. Guy Woodford reports. Repairing pothole damage to highways and vehicles across Europe costs responsible authorities and individual motorists hundreds of millions of euros each year. Yet it has cost just €20,204 to make the potentially crucial first step in identifying a method of keeping highways across the continent and beyond pothole fr
  • Windsor & Maidenhead starts £114.8 million highways competition
    May 5, 2025
    The seven-year maintenance contract covers 632km of roads as well as footways and bridges throughout the English borough just west of London.
  • Weigh in motion technology reduces road damage
    February 8, 2012
    Overweight vehicles cause enormous damage to road structures but they can be caught, even at high speed. Weigh-in-motion or WIM devices are designed to capture and record axle weights and gross vehicle weights as vehicles drive over a measurement site.