Skip to main content

Fugro complete ‘7,000km’ TRASS contract

Fugro Aperio collected and processed data from up to 7,000km lanes of English trunk roads as part of a just completed Traffic Speed Structural Survey (TRASS) contract. The work, commissioned by TRL on behalf of the Highways Agency (HA), saw the Cambridge-based survey specialist gain information using the HA’s Traffic Speed Deflectometer (TSD). The innovative TSD technology uses Doppler lasers to measure the speed at which the pavement deflects in response to load.
April 23, 2012 Read time: 2 mins
2929 Fugro Aperio collected and processed data from up to 7,000km lanes of English trunk roads as part of a just completed Traffic Speed Structural Survey (TRASS) contract.

The work, commissioned by 777 TRL on behalf of the 2309 Highways Agency (HA), saw the Cambridge-based survey specialist gain information using the HA’s Traffic Speed Deflectometer (TSD).
The innovative TSD technology uses Doppler lasers to measure the speed at which the pavement deflects in response to load. The non-contact IT allows surveys to be conducted at up to 80kph, vastly reducing the risk to motorists caused by slower moving deflection techniques such as deflectograph and falling weight deflectometer (FWD).

The survey data, gathered over a two-month period during February and March 2012, is part of the HA’s drive to implement annual structural testing on the English trunk road network. It will be used to help service providers better identify and prioritise maintenance schemes as well as to help calculate the value of the pavement asset.

TRASS surveys have been underway since 2009, with the ultimate aim of using them for scheme level assessment and design by 2016.

For more information on companies in this article

Related Content

  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • Safe road successes
    February 29, 2012
    According to the latest data from the International Transport Forum, there has been a steep decline in road deaths during first decade of 21st century in 33 countries.
  • UAE system: IRF Global Road Achievement Awards Laureate
    March 8, 2016
    UAE’s Pavement and Asset Management System. The Federal Road Network of the United Arab Emirates (UAE) comprises 670km of roads, mainly highways, with 3,100 lane-km. These roads connect the Northern Emirates (Ajman, Fujairah, Ras Al Khaima, Sharjah and Umm Al Quwaim) with the Emirate of Dubai and Oman. Knowing the importance of preserving these strategic road links, the UAE’s Ministry of Public Works started the implementation of an Asset and Pavement System in June 2012. The Road Department embarked on