Skip to main content

Fugro complete ‘7,000km’ TRASS contract

Fugro Aperio collected and processed data from up to 7,000km lanes of English trunk roads as part of a just completed Traffic Speed Structural Survey (TRASS) contract. The work, commissioned by TRL on behalf of the Highways Agency (HA), saw the Cambridge-based survey specialist gain information using the HA’s Traffic Speed Deflectometer (TSD). The innovative TSD technology uses Doppler lasers to measure the speed at which the pavement deflects in response to load.
April 23, 2012 Read time: 2 mins
2929 Fugro Aperio collected and processed data from up to 7,000km lanes of English trunk roads as part of a just completed Traffic Speed Structural Survey (TRASS) contract.

The work, commissioned by 777 TRL on behalf of the 2309 Highways Agency (HA), saw the Cambridge-based survey specialist gain information using the HA’s Traffic Speed Deflectometer (TSD).
The innovative TSD technology uses Doppler lasers to measure the speed at which the pavement deflects in response to load. The non-contact IT allows surveys to be conducted at up to 80kph, vastly reducing the risk to motorists caused by slower moving deflection techniques such as deflectograph and falling weight deflectometer (FWD).

The survey data, gathered over a two-month period during February and March 2012, is part of the HA’s drive to implement annual structural testing on the English trunk road network. It will be used to help service providers better identify and prioritise maintenance schemes as well as to help calculate the value of the pavement asset.

TRASS surveys have been underway since 2009, with the ultimate aim of using them for scheme level assessment and design by 2016.

For more information on companies in this article

Related Content

  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.
  • Fugro-TRL alliance to supply integrated highways asset management solutions
    June 5, 2014
    Fugro has signed an agreement with TRL, the UK-based, globally renowned transport research firm and consultancy, to merge data collection and asset management expertise for highways clients worldwide. In teaming up, Fugro and TRL aim to deliver an enhanced range of specialist services, efficiently integrated to maximise value for the asset management programmes of government departments and highways authorities. Clients will have access to world class asset management proficiency and surveying capabilities
  • Fugro wins 3-year pavement assessment contract with UK council
    December 13, 2012
    Fugro has secured a three-year contract with Luton Borough Council in southern England to provide a range of highway and footway investigations, including the Council’s annual SCANNER surveys using Fugro’s ARAN (Automatic Road Analyser) survey system. The survey package also includes SCRIM (surface friction) testing of Luton’s A, B and C roads, and CVI (coarse visual inspection) of unclassified roads. Cambridge-based Fugro transport specialists will process the survey data to generate NI (national indicator
  • Fugro plans UK road conference for July
    April 24, 2013
    Survey specialist Fugro is setting out plans for an upcoming highways seminar, which will be held in July 2013 in Birmingham. The firm has been involved with the Developments in Pavement Assessment conference for the last 12 years and is now relaunching the event with a broader view to include all elements of the highway network. The 13th edition of the one day conference is now being retitled Developments in Highways Assessment (DIHA). The event is aimed at highway engineers, network and asset managers, th