Skip to main content

Fugro complete ‘7,000km’ TRASS contract

Fugro Aperio collected and processed data from up to 7,000km lanes of English trunk roads as part of a just completed Traffic Speed Structural Survey (TRASS) contract. The work, commissioned by TRL on behalf of the Highways Agency (HA), saw the Cambridge-based survey specialist gain information using the HA’s Traffic Speed Deflectometer (TSD). The innovative TSD technology uses Doppler lasers to measure the speed at which the pavement deflects in response to load.
April 23, 2012 Read time: 2 mins
2929 Fugro Aperio collected and processed data from up to 7,000km lanes of English trunk roads as part of a just completed Traffic Speed Structural Survey (TRASS) contract.

The work, commissioned by 777 TRL on behalf of the 2309 Highways Agency (HA), saw the Cambridge-based survey specialist gain information using the HA’s Traffic Speed Deflectometer (TSD).
The innovative TSD technology uses Doppler lasers to measure the speed at which the pavement deflects in response to load. The non-contact IT allows surveys to be conducted at up to 80kph, vastly reducing the risk to motorists caused by slower moving deflection techniques such as deflectograph and falling weight deflectometer (FWD).

The survey data, gathered over a two-month period during February and March 2012, is part of the HA’s drive to implement annual structural testing on the English trunk road network. It will be used to help service providers better identify and prioritise maintenance schemes as well as to help calculate the value of the pavement asset.

TRASS surveys have been underway since 2009, with the ultimate aim of using them for scheme level assessment and design by 2016.

For more information on companies in this article

Related Content

  • A virtual virtuous circle
    March 19, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas
  • Norway mega-project contract for Fugro
    December 20, 2017
    The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
  • New report suggests older drivers are safe
    December 4, 2012
    A new report by the Institute of Advanced Motorists (IAM) in the UK suggests that older drivers are as safe as drivers from all other age groups, and perhaps more so. The study shows older drivers have better attitudes to safety, deal with hazards better than young drivers and use experience to increase their safety margins on the road. The report reveals that drivers over 75 react just as quickly as other age groups when a vehicle emerges from a side road or if the car in front brakes suddenly on a rural r
  • Highways England to trial different speeds through road works
    August 6, 2018
    Highways England is trialling different speed limits through roadworks during different times in order to respond to drivers’ feedback. Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads, said it is acting on drivers’ frustration with roadworks. Speed through motorway roadworks could be increased depending on what day of the week they are travelling. The decision follows earlier trials to increase the speed l