Skip to main content

Frost-heave a problem on Norwegian roads

Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but
May 8, 2012 Read time: 1 min
Frost-heaving continues to be a problem on Norwegian roads despite the introduction of tougher regulations for building and frost securing over the last 20-30 years. An expert group at the Norwegian Public Roads Administration (1208 Statens Vegvesen) has reviewed the problem and concluded that lacking technical competence among road builders and those controlling construction is the main problem. Norway’s Directorate of Public Roads (Vegdirektoratet) admits that there are problems with the lack of competence but says measures are being taken to make improvements. These include more collaboration with universities and internal training. Highway E18 between Krosby and Knapstad, E16 between Wøyen and Bjørum and a section of trunk road 2 are among those most affected by frost-heaving.

For more information on companies in this article

Related Content

  • Building Norway's longest suspension bridge
    March 2, 2012
    AT 1.38KM LONG, the new €213 million Hardanger Bridge crossing Hardangerfjord, Norway's second largest fjord, will be the country's longest suspension bridge. The structure, designed by Norway's Forum Arkitekter, will be a new landmark with its 200m high concrete towers and steel construction.
  • PERI’s balancing act at the Harpe Bru Bridge in Norway
    May 24, 2016
    Plans for the European Route E6 expansion in Norway include the 320m-long Harpe Bru Bridge over the Gudbrandsdalen Lågen River, at Sør-Fron in Oppland province. For the superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit. Statens vegvesen, Norway’s agency for public road building, selected an extradosed cable-stayed bridge design – the first such bridge in Norway. It combines the load-bearing behaviour
  • Norway’s massive Rogfast project
    January 31, 2025
    Norway’s massive Rogfast tunnel project will boost connectivity.
  • Road safety concepts aimed at developing nations
    October 31, 2012
    In this second of a two-part interview, Rohit Baluja introduces the work of the Delhi-based Institute of Road Traffic Education that he established in 1991 by way of practical response to the particular challenges of road safety in a developing world context Despite the alarming trends outlined in the first part of this article (World Highways: Vol.21, Issue No.6), Rohit Baluja remains optimistic that, if only the proper foundations of traffic management systems can be established, there is no reason why dr