Skip to main content

FPT Industrial reveals R22 three-cylinder engine

FPT Industrial’s latest compact diesel engine is the R22 – a three-cylinder power unit that covers the 33-52kW sector. Based on one of the firm’s VM engine platforms, the R22 has adopted a single canister approach to achieving Tier 4 Final emissions legislation.
March 8, 2014 Read time: 1 min
FPT’s R22 three-cylinder engine covers 33-52kW.
FPT Industrial’s latest compact diesel engine is the R22 – a three-cylinder power unit that covers the 33-52kW sector.

Based on one of the firm’s VM engine platforms, the R22 has adopted a single canister approach to achieving Tier 4 Final emissions legislation. As a result, it combines a diesel oxidation catalyst with a partial-flow filter and cooled exhaust gas recirculation.

FPT’s solution uses passive regeneration and is therefore a fully automatic system that needs no intervention from the operator.
The firm expects to the see the R22 series in different states of tune – adjustments are little more than a change of data sets on the engine ECU – being installed in mini excavators, gen-sets and pumps, for example.
%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 55781 0 oLinkExternal www.fptindustrial.com Visit FPT Industrial Website false /EasySiteWeb/GatewayLink.aspx?alId=55781 false false%>

Related Content

  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • JT60 joins Ditch Witch drill range
    January 6, 2017
    Ditch Witch has introduced two directional drills, the JT60 and the JT60 All terrain. Both drills offer 267kN of thrust and pullback, along with up to 12,200Nm of rotational torque. Customers can choose between a 142kW Tier 3 engine or a 149kW Tier 4 Interim diesel, depending on territory. Both come with a 560l/min fluid pump that helps to ensure productive drilling, which is fully enclosed to reduce noise and to protect components. In answer to customer research, the JT60 drills come with a climate contro
  • Fuller EmiControls on emissions
    January 6, 2017
    EmiControls new large turbine – the V22 – will be showcased at bauma 2013. The company, which began trading independently in 2012, offers mobile and stationary solutions for optimum dust emission control during demolition, recycling plant, quarry, mining and industrial-based applications.