Skip to main content

Four offers for Sibiu-Pitesti A1 motorway Lot 4 section

Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
September 4, 2019 Read time: 2 mins

Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway.

The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction.

The bidders are from China, Turkey, Austria and Italy.

Lot 4 runs nearly 11km from Curtea de Argeș to Tigveni.

The 576km A1will connect the capital Bucharest with the Banat and Crișana regions in the western part of the country, running in a south-east to north west direction. It connects the major cities of Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

The motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor and so reportedly receives 85% funding from the 1116 European Union.

For more information on companies in this article

Related Content

  • Serbia approves merger of Koridori Srbije and Putevi Srbije
    November 25, 2014
    Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and Koridori Srbije (Corridors of Serbia). Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land. The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully red
  • Work starts on Komarno-Komarom Bridge between Slovakia and Hungary
    October 31, 2017
    Construction has started on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Last summer it was announced that the Hungarian companies Hidepito and Meszaros es Meszaros had won the tender for the 600m bridge but with a price tag of just over €91 million, according to Hungarian media. It was also reported at the time
  • Slovakia: Strazov-Brodno D3 route around Zilnia to get EU funds
    May 10, 2016
    The European Union is providing nearly €202 million to finish the section of the D3 motorway between Strazov and Brodno around the city of Zilina in Slovakia. Zilnia is in north-west of Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. It is the fourth largest city of Slovakia with a population of around 85,000. The D3, formerly D18, is sometimes called the Kysuce Motorway. It was originally to be only a two-lane motorway in the Čadca - Slovak/Polish border
  • Spedition UMB and Tehnostrade to build an orbital around Bacau
    August 14, 2018
    A joint venture of Spedition UMB and Tehnostrade has won the design-build contract for an orbital road around the Romanian city of Bacau. Romania’s National Company for the Administration of Road Infrastructure (CNAIR) awarded the contract that is expected to be worth almost €145 million. Planning is expected to last six months and construction to take 30 months for the nearly 31km road of which around 16km will be motorway. The road around Bacau, with a population of more than 200,000, will be integr