Skip to main content

Four offers for Sibiu-Pitesti A1 motorway Lot 4 section

Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
September 4, 2019 Read time: 2 mins

Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway.

The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction.

The bidders are from China, Turkey, Austria and Italy.

Lot 4 runs nearly 11km from Curtea de Argeș to Tigveni.

The 576km A1will connect the capital Bucharest with the Banat and Crișana regions in the western part of the country, running in a south-east to north west direction. It connects the major cities of Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

The motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor and so reportedly receives 85% funding from the 1116 European Union.

For more information on companies in this article

Related Content

  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Serbia inks two road deals with China at 16plus1 summit
    April 23, 2019
    Serbia said it signed two road construction agreements with China during the 16plus1 Summit in Dubrovnik, Croatia earlier this month. The two deals are for construction of the Pozega-Boljare and Novi Beograd-Surcin road routes. The Pozega-Boljare project alone is worth €2 billion and will be financed from the existing loan from the Exim Bank, according to media reports. China’s east-west Belt and Road Initiative was the focus of the annual 16plus1 Summit that brought together leaders from Beijing plus