Skip to main content

Four offers for Sibiu-Pitesti A1 motorway Lot 4 section

Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
September 4, 2019 Read time: 2 mins

Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway.

The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction.

The bidders are from China, Turkey, Austria and Italy.

Lot 4 runs nearly 11km from Curtea de Argeș to Tigveni.

The 576km A1will connect the capital Bucharest with the Banat and Crișana regions in the western part of the country, running in a south-east to north west direction. It connects the major cities of Pitești, Sibiu, Deva, Timișoara and Arad, reaching Hungary's M43 motorway near Nădlac.

The motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor and so reportedly receives 85% funding from the 1116 European Union.

For more information on companies in this article

Related Content

  • Riga's transport infrastructure system to get a boost from EU funding
    February 11, 2014
    The European Union will support with over €1.5 million from the TEN-T Programme a series of studies looking at the connection of the Freeport of Riga in Latvia to the TEN-T road network. The studies, selected under the 2012 TEN-T Annual Programme, specifically concern the detailed design needed ahead of the construction in 2016 of a 9.1km stretch (Segment 1) of the Riga Northern Transport Corridor (Northern Corridor). The Northern Corridor is an east-west motorway which will cross the old historic town ce
  • Georgia's East-West Highway
    February 17, 2012
    One of the most important priorities of the Government of Georgia is the construction and rehabilitation of the East-West Highway in accordance with international standards.
  • Last section of Osman Gazi Bridge lifted into place over Izmit Gulf
    May 4, 2016
    The last section of the 3km İzmit Bay Bridge – now officially the Osman Gazi Bridge - was lifted into place on April 21, according to Turkish media. When open later this summer, the bridge will cut the 70-minute drive around İzmit Gulf, on the Sea of Marmara, to just six minutes.
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t