Skip to main content

Float positioning for Bandra Worli Bridges

In Mumbai, India, two steel bridges have been barged to site and then lifted into position as part of the Mumbai Coastal Road-Bandra Worli Sea Link project.
By David Arminas May 29, 2024 Read time: 2 mins
The new steel girder arch bridges - one for southbound traffic and one for northbound - were built at the nearby Mazagon Dock's Nhava unit (image courtesy X/BMC)

Two arch bridges have been floated onto site and then lifted into place as part of the 29km Mumbai Coastal Road-Bandra Worli Sea Link project.

Barges carrying the steel girder bow-string bridges secured them into position while lifting took place at night, according to local media reports.

When finished, the eight-lane Mumbai Coastal Road in Mumbai’s Worli peninsula will cut travel time between south Mumbai and the western suburbs from two hours to 40 minutes. The client is Brihanmumbai Municipal Corporation (BMC).

The cable-stayed 5.6km Bandra-Worli Sea Link - officially the Rajiv Gandhi Sea Link – is eight lanes wide and links Bandra in the Western Suburbs of Mumbai with Worli in South Mumbai. It is the longest sea bridge, as well as the 5th longest bridge in India after the Mumbai Trans Harbour Link, Bhupen Hazarika Setu, Dibang River Bridge and Mahatma Gandhi Setu.

The new steel girder arch bridges, one for southbound traffic and one for northbound, were built at the nearby Mazagon Dock's Nhava unit. They are part of the main project being delivered by the joint venture of Hindustan Construction Company and the Hyundai Development Corporation. AECOM is the general engineering consultant for the project and Freight Wings is providing the transportation and lifting services.

Paving of the bridges should be finished by the end of June. The steel arch structures are part of the 850m-long bridge that includes concreted sections adjoining both ends of the steel arch bridges to complete the crossing.

For more information on companies in this article

Related Content

  • New US$1.33bn road route planned for Maharashtra, west India
    June 19, 2014
    The state government of Maharashtra in west India is planning to build a 35km road between Kandivli and Nariman Point in the state's western suburban region. The US$1.33 billion (INR 80 billion) road is planned to have 18 access points and the state government might appoint BrihanMumbai Municipal Corporation (BMC) or Maharashtra State Road Development Corporation (MSRDC) to implement the project on a joint venture basis.
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.