Skip to main content

Float positioning for Bandra Worli Bridges

In Mumbai, India, two steel bridges have been barged to site and then lifted into position as part of the Mumbai Coastal Road-Bandra Worli Sea Link project.
By David Arminas May 29, 2024 Read time: 2 mins
The new steel girder arch bridges - one for southbound traffic and one for northbound - were built at the nearby Mazagon Dock's Nhava unit (image courtesy X/BMC)

Two arch bridges have been floated onto site and then lifted into place as part of the 29km Mumbai Coastal Road-Bandra Worli Sea Link project.

Barges carrying the steel girder bow-string bridges secured them into position while lifting took place at night, according to local media reports.

When finished, the eight-lane Mumbai Coastal Road in Mumbai’s Worli peninsula will cut travel time between south Mumbai and the western suburbs from two hours to 40 minutes. The client is Brihanmumbai Municipal Corporation (BMC).

The cable-stayed 5.6km Bandra-Worli Sea Link - officially the Rajiv Gandhi Sea Link – is eight lanes wide and links Bandra in the Western Suburbs of Mumbai with Worli in South Mumbai. It is the longest sea bridge, as well as the 5th longest bridge in India after the Mumbai Trans Harbour Link, Bhupen Hazarika Setu, Dibang River Bridge and Mahatma Gandhi Setu.

The new steel girder arch bridges, one for southbound traffic and one for northbound, were built at the nearby Mazagon Dock's Nhava unit. They are part of the main project being delivered by the joint venture of Hindustan Construction Company and the Hyundai Development Corporation. AECOM is the general engineering consultant for the project and Freight Wings is providing the transportation and lifting services.

Paving of the bridges should be finished by the end of June. The steel arch structures are part of the 850m-long bridge that includes concreted sections adjoining both ends of the steel arch bridges to complete the crossing.

For more information on companies in this article

Related Content

  • Louis Berger wins key India bridge deal
    January 10, 2018
    Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year