Skip to main content

Five things road construction crews should not do

Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.
June 19, 2015 Read time: 1 min
Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show.

Here are five things that construction crews should not do.


1)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t paint the white lines on a road after going to the pub image link 1 false http://img.memecdn.com/road-fail_o_1759781.jpg false false%>


2)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t scare drivers when they approach road works image link 2 false http://images6.fanpop.com/image/photos/36100000/Funny-Pictures-image-funny-pictures-36133764-500-375.jpg false false%>


3)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t play games on the road construction site image link 3 false http://www.hivissupply.com/blog/wp-content/uploads/2013/12/why-road-work-takes-so-long.jpg false false%>


4)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t be nasty to the construction site foreman image link 4 false https://s-media-cache-ak0.pinimg.com/736x/8b/99/ba/8b99ba003efc6e9567a46a29b108d2cc.jpg false false%>


5)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t laugh at motorists as they cope with lane and road closures imagel link 5 false https://sightsandsoundsinc.files.wordpress.com/2010/07/road-construction2.jpg false false%>

Related Content

  • Euro Auctions is expanding its global operations with new acquisition
    March 27, 2013
    Euro Auctions is revealing its expansion plans for 2013 with the addition of a new site to its operations. Based in Dromore, Northern Ireland, Euro Auctions has been conducting unreserved auctions of industrial equipment and construction machinery since 1998. The company has permanent auction sites in Northern Ireland, England, Germany, Spain, Australia and now the USA.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Wirtgen develops novel cutter wear system
    January 6, 2017
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W