Skip to main content

Five things road construction crews should not do

Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.
June 19, 2015 Read time: 1 min
Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show.

Here are five things that construction crews should not do.


1)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t paint the white lines on a road after going to the pub image link 1 false http://img.memecdn.com/road-fail_o_1759781.jpg false false%>


2)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t scare drivers when they approach road works image link 2 false http://images6.fanpop.com/image/photos/36100000/Funny-Pictures-image-funny-pictures-36133764-500-375.jpg false false%>


3)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t play games on the road construction site image link 3 false http://www.hivissupply.com/blog/wp-content/uploads/2013/12/why-road-work-takes-so-long.jpg false false%>


4)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t be nasty to the construction site foreman image link 4 false https://s-media-cache-ak0.pinimg.com/736x/8b/99/ba/8b99ba003efc6e9567a46a29b108d2cc.jpg false false%>


5)    %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Don&#8217;t laugh at motorists as they cope with lane and road closures imagel link 5 false https://sightsandsoundsinc.files.wordpress.com/2010/07/road-construction2.jpg false false%>

Related Content

  • CTE holds dealer training at bauma
    April 19, 2013
    CTE held a successful dealer training session at bauma, aimed particularly at sharing product information including its new Zed truck-mounted articulated platforms’ variable jacking system. Other key areas of focus included the new Traccess models – which are almost ready to be presented to the market. CTE dealers were present from Russia, Slovakia, the Czech Republic, Serbia, France, England, Germany, Switzerland, Holland, Denmark, Belgium, Australia, China and the Middle East.
  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    January 6, 2017
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    January 6, 2017
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.