Skip to main content

Five consortia interested in Romania’s Pitesti-Craiova highway project

The Romanian Prime Minister Victor Ponta has revealed that five consortia have entered bids to land the contract for the construction of the €2.08 billion (RON 9bn) 121km Pitesti-Craiova highway. The deadline for the submission of bids was 8 May 2013. Offers were submitted by a consortium formed by Romanian companies such as Spedition UMB, Tehnostrade and Vectra Service. The other four consortia that filed bids are: Obrascon Huarte Lain/OHL ZS (Spain), China Communications Construction Company/Dogus Insaat
May 10, 2013 Read time: 1 min

The Romanian Prime Minister Victor Ponta has revealed that five consortia have entered bids to land the contract for the construction of the €2.08 billion (RON 9bn) 121km Pitesti-Craiova highway. The deadline for the submission of bids was 8 May 2013.

Offers were submitted by a consortium formed by Romanian companies such as Spedition UMB, Tehnostrade and Vectra Service. The other four consortia that filed bids are: Obrascon Huarte Lain/980 OHL ZS (Spain), 2661 China Communications Construction Company/Dogus Insaat Ve Ticaret (Turkey)/2376 EGIS Projects (France), 3149 Impregilo/Salini (Italy) and 945 Strabag (Austria)/5177 Vinci (France)/1570 Aktor (Greece).

For more information on companies in this article

Related Content

  • Romania to start work on the Sibiu-Pitesti A1 section in 2017
    April 17, 2015
    Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
  • Funding problems for Bosnia's highway project
    May 14, 2012
    The Bosnian autonomous entity Republika Srpska recently cancelled a highway contract with Austrian construction company Strabag. The problem arose from alleged “irregularities” that saw the contract being awarded directly to Strabag without the work being put out for tender. Because of this, international financial institutions such as the European Bank for Reconstruction and Development (EBRD) have said they will not fund the project.
  • Spedition UMB and Tehnostrade to build an orbital around Bacau
    August 14, 2018
    A joint venture of Spedition UMB and Tehnostrade has won the design-build contract for an orbital road around the Romanian city of Bacau. Romania’s National Company for the Administration of Road Infrastructure (CNAIR) awarded the contract that is expected to be worth almost €145 million. Planning is expected to last six months and construction to take 30 months for the nearly 31km road of which around 16km will be motorway. The road around Bacau, with a population of more than 200,000, will be integr
  • Tenders placed for Polish expressway project
    July 22, 2014
    Bidding has been strong for an expressway project in Poland. The S7 route will connect Olsztynek and Milomyn with the Ostroda ring road. The project is expected to cost in the region of €350.64 million to construct in all. Seven bidders competed for the project with a consortium comprising contractors Intercor, Erbedim and Pozbud making the highest offer at €416.42 million. The lowest offer meanwhile came from another construction consortium comprising the companies Salini, Todini and Impregilo with a bid o