Skip to main content

First public outing for Liebherr tower crane at INTERMAT

Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
January 6, 2017 Read time: 2 mins
718 Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane.

The 380tonne unit tops the 15-model range, which starts from 50tonnes.

The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.

The 380 EC-B 16 superstructure can be fitted to both Liebherr’s IC or HC tower systems. The IC towers are 1.9 x 1.9metres and the climbing system allows it to climb both on and inside a building. With the IC tower system, the free-standing hook height can be almost 70m, while on the HC tower system that increases to almost 85m.

Speeding assembly are Liebherr’s ‘Connect and Work’ quick-action connections for the jib and counter-jib, LiConnect jib connections and electrical plug-in connections for the drives and switchgear.

There are slip-resistant catwalks on the jib and counter-jib along with safety railings where needed.

A four-chord counter-jib enables five trucks to transport the complete superstructure with each individual part able to fit into a container.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.liebherr.com Liebherr website false http://www.liebherr.com/ false false%>

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Snow removal: a right way and a wrong way
    June 12, 2015
    Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities. Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.
  • New integration with Carlson Machine Control and Atlas Copco’s FlexiROC with HEC3 Drills
    January 6, 2017
    Installation and testing has been completed at the Atlas Copco factory in Örebro, Sweden, on the first system integration of Carlson Machine Control’s CBx5 control box console running Carlson DrillGrade software on a FlexiROC HEC3 C65 drilling system. This is said to mark the first successful factory installation of a 3D drilling system integrating Atlas Copco’s new third party protocol available on FlexiROC drills with the HEC3 system. The first of several systems has been delivered to a mine in Finland an
  • New integration with Carlson Machine Control and Atlas Copco’s FlexiROC with HEC3 Drills
    February 13, 2013
    Installation and testing has been completed at the Atlas Copco factory in Örebro, Sweden, on the first system integration of Carlson Machine Control’s CBx5 control box console running Carlson DrillGrade software on a FlexiROC HEC3 C65 drilling system. This is said to mark the first successful factory installation of a 3D drilling system integrating Atlas Copco’s new third party protocol available on FlexiROC drills with the HEC3 system. The first of several systems has been delivered to a mine in Finland an
  • A wide array of new road machinery drives is available from Bonfiglioli
    January 6, 2017
    Bonfiglioli is broadening its range of drives for road construction equipment with a series of new products for use in milling machines, pavers and compactors. The new milling drive for asphalt planers now features a two-stage gear motor with reinforced bearings on the integrated pulley mounting shaft. The technical specifications for this new solution include integrated lubrication that eliminates the need for a system installed in the milling head and maximises lubrication efficiency. There is also an off