Skip to main content

Finance change on Orlovski Tunnel

A change in financing arrangements has been announced by the local authorities in Russian city St Petersburg for the Orlovski Tunnel project. This move is being made due to changes in terms and costs for the project, which is for the construction of a new road tunnel under the city that is intended to alleviate congestion.
July 9, 2012 Read time: 1 min
A change in financing arrangements has been announced by the local authorities in Russian city St Petersburg for the Orlovski Tunnel project.

This move is being made due to changes in terms and costs for the project, which is for the construction of a new road tunnel under the city that is intended to alleviate congestion.

The terms of subsidies from the investment fund are postponed from 2009-2013 to 2011-2015. The cost of the project has increased from €584.6 million to €1 billion.

The authorities in St Petersburg, Russia are pushing ahead with construction of the second stage of the Western High-Speed Diameter (WHSD) highway. Some €472.75 million worth of financing is being supplied by the Federal Investment Fund in all and the work is due to start this year and be completed in 2014.

Related Content

  • Bridge savings in Scotland to fund road improvements
    August 27, 2014
    The project to construct the new Forth Crossing close to Scottish capital Edinburgh is looking extremely positive, with cost savings envisaged for the bridge. The Queensferry Crossing scheme now looks to require slightly less funding than had been originally expected when the plans were unveiled in 2011, due in part to tight controls over spending. The bridge costs had been budgeted at close to €2 billion (£1.6 billion) initially but the project now looks likely to cost €1.81 billion (£1.45 billion). The sa
  • Funding pledge boost for St Petersburg city centre bypass plans
    November 11, 2013
    St Petersburg’s city centre bypass is a vital step closer to being realised after the Russian city’s committee on economic policy and strategic planning said it will be submitting proposals for co-financing of the project to the Ministry of Transport. The bypass highway, earmarked to be built along the Obvodny Canal, is expected to cost US$1.53 billion (RUB 50 billion). An application for federal budget funds will likely be filed in 2014. The project, which stipulates construction of embankments, bridges,
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Bosnia tunnel project; work starting
    November 1, 2019
    Construction work is due to start on the Prenj Tunnel project in Bosnia. The tunnel will form part of the important Corridor 5C route. Measuring 10km in length, the road and tunnel project is expected to cost €820 million to build. Funding is being supplied jointly by the European Investment Bank (EIB) and the European Bank for Reconstruction and Development (EBRD). The Bosnian Government has also secured a portion of the necessary funding from Bosnian banks. In addition, a contract has been agreed for the