Skip to main content

Final push to finish Vologda bypass in northwest Russia

Construction has started on the final section of the bypass around Vologda, a city of around 305,000 on the Vologda River in northwest Russia. Russian media report that the first three phases of the project have been launched. The total cost of the works is US$219 million.
August 17, 2017 Read time: 1 min

Construction has started on the final section of the bypass around Vologda, a city of around 305,000 on the Vologda River in northwest Russia.

Russian media report that the first three phases of the project have been launched. The total cost of the works is US$219 million.

Related Content

  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.
  • St Petersburg link may include tunnel
    September 28, 2017
    A new alignment is being considered for a major project in Russia’s second city, St Petersburg. A tunnel stretch running under the Neva River is being considered as an alternative route for the Eastern High Speed Diameter (EHSD) project. This tunnel would take the place of the fixed bridge, which has been criticised by some for its impact on the city’s skyline. However building the tunnel would increase the cost of the project by around US$52 million.
  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.
  • Russian road deals planned
    November 27, 2020
    Russian road deals are being planned.