Skip to main content

Final push to finish Vologda bypass in northwest Russia

Construction has started on the final section of the bypass around Vologda, a city of around 305,000 on the Vologda River in northwest Russia. Russian media report that the first three phases of the project have been launched. The total cost of the works is US$219 million.
August 17, 2017 Read time: 1 min

Construction has started on the final section of the bypass around Vologda, a city of around 305,000 on the Vologda River in northwest Russia.

Russian media report that the first three phases of the project have been launched. The total cost of the works is US$219 million.

Related Content

  • French highway project underway
    May 27, 2021
    A key French highway project will get underway shortly
  • Metrostav/Strabag win Edvard Benes deal
    November 23, 2023
    The €22 million renovation on the bridge over the Elbe in the Czech Republic will start in 2025.
  • MOBA’s World Cup highway mission
    April 23, 2013
    The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula.
  • France’s Chambon Tunnel on D1091 is final reconstruction phase
    August 17, 2017
    The reinforced Chambon Tunnel in the southeast French Alps region will open on schedule by the end of the year. The tunnel, which carries the D1091, was partially reopened at the end of last year following a landslide in 2015 along the mountain through with the bore is located. Local media report that from the end of this month, the tunnel will be closed again for the final phase of lining work. The road connects Bourg d’Oisans and the Col du Lautaret and Col du Galibier.