Skip to main content

Fiat Industrial renews 3-year committed revolving credit facility

Fiat Industrial has signed the renewal of a US$2.69 billion (€2bn) three-year committed revolving credit facility with 21 banks. The deal is said by Fiat Industrial to demonstrate the strong support the Group enjoys from its key relationship banks. The facility is intended for general corporate purposes and working capital needs and replaces the US$2.69 billion three-year revolving credit facility originally signed in December 2010.
February 8, 2013 Read time: 1 min
6892 Fiat Industrial has signed the renewal of a US$2.69 billion (€2bn) three-year committed revolving credit facility with 21 banks.

The deal is said by Fiat Industrial to demonstrate the strong support the Group enjoys from its key relationship banks. The facility is intended for general corporate purposes and working capital needs and replaces the US$2.69 billion three-year revolving credit facility originally signed in December 2010.

For more information on companies in this article

Related Content

  • Fayat finalises Dynapac deal and closes acquisition
    October 5, 2017
    Fayat has now completed its acquisition of Dynapac. French firm Fayat has acquired the Road Construction Equipment Division of Atlas Copco, which manufactures rollers for asphalt and soil applications, pavers and planers. These products are known under the Dynapac trade name. The agreement includes sales and services operations in 37 countries, production units in four countries: Sweden, Germany, Brazil and China and a production partnership in India.
  • Morocco’s new motorway links are boosting connectivity
    December 16, 2014
    Morocco’s massive motorway construction programme will improve transport connections and boost this North African country’s economy - Mike Woof reports A massive road building programme is transforming Morocco, with new motorways connecting cities and major towns, as well as many new rural roads being built. The Moroccan Government has set an impressive plan for its infrastructure investment that will see even the country’s small and remote villages having proper connections to the main road network. The
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Safer blasting
    July 4, 2012
    Three years of development and field trials have resulted in the proven SparkMaster system from ASL. This sophisticated initiator is said to meet the needs of explosive engineers requiring a reliable shocktube-based system. The SparkMaster has been designed to suit an array of site conditions and can provide reliability even in challenging environments. The solid-state, ergonomically-designed unit is portable, robust, highly-visible and weighs just 700grammes. It can be operated while still inside its weath