Skip to main content

Fehmarn Belt tunnel work to start in January

Construction of the large-scale tunnel element factory at Rødbyhavn can now start soon.
By David Arminas April 29, 2020 Read time: 3 mins
Rødbyhavn work harbour will be one of Denmark’s largest factories (image copyright Fermen A/S)

Construction of the immersed Fehmarn Belt road and rail tunnel between Denmark and Germany will start in January 2021, according to the project owner Femern.

The planned 18km tunnel under the Baltic Sea, between the Danish island of Lolland and the German island of Fehmarn, received approval from the European Commission last month. However, Germany still needs to give its final approval which is expected this autumn.

Dutch construction company BAM will receive a quarter of the €3.4 billion (US$3.92 billion) spent on a contract for the tunnel construction. Meanwhile, Dutch dredging companies Boskalis and Van Oord will receive €300 million each for the dredging of the tunnel. The tunnel is expected to be opened to traffic in 2029, according to a report in the Dutch newspaper Der Telegraaf.

Femern is in charge of planning and providing the basis for regulatory approval of the project on behalf of the Danish government. The framework for this work falls under a treaty between Denmark and Germany which was signed in 2008.

Femern said it is “activating the main construction contracts” with Dutch contractors’ consortium Femern Link Contractors from January 1, 2021.

“This means that construction of the large-scale tunnel element factory at Rødbyhavn can get underway,” according to a posting on Femern’s website. The work harbour is the gateway to the construction of the tunnel element factory, which will be will be one of the biggest factories in Denmark. From here the 73,000-tonne tunnel elements will be shipped out to the Fehmarnbelt – the strait between Fehmarn and Lolland.

Femern also said that it is already engaged in a number of construction site preparations for the tunnel on the German side at Puttgarden so that further progress can be made when Germany gives formal approval of the project.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern.

The Fehmarnbelt link will be user-financed. Revenues from the link will go to repay the loans that finance construction; the same model that financed the Storebælt and Øresund links. Denmark’s Parliament will decide the tolls and the operator Femern has said that there likely will be discounts such as weekend tickets, as is the case on the Øresund and Storebælt links.

Meanwhile, due to the spread of the COVID-19 virus, organisers of the Fehmarnbelt Days 2020 festival conference postponed the event that was to have taken place May 17. The Fehmarnbelt Days Secretariat said that an alternative date will be announced shortly. Since 2012 the Fehmarnbelt Days have dealt with key areas such as infrastructure, tourism, business, the labour market, transport and logistics as well as education and research.

For more information on companies in this article

Related Content

  • Denmark: Acciona, Rizzanni and Besix awarded Frederikssund project
    September 21, 2016
    The consortium of Spanish construction firm Acciona Infraestructura, Rizzanni of Italy and Besix of Belgium has been awarded the contract to build the Frederikssund motorway connection in Denmark. The €132 million deal across Roskilde fiord includes 8km of dual carriageway roads with double lane and a 1.3km tolled bridge. In January 2014, Arup was appointed as lead consultant to the Danish Road Directorate – Vejdirektoratet - for the design, procurement and site supervision of the new Roskilde Fjord L
  • Brazil’s Parana state continues with infrastructure investment
    January 8, 2015
    The Brazilian state government of Parana has spent around US$1.73 billion on infrastructure projects over the past four years, including roads, railways, airports, ports and public buildings. According to Jose Richa Filho, the state’s infrastructure secretary, more investments will be made by local partners and through international financing. Around $3.63 million for road works between 2015 and 2018 with fund coming from partnerships with Votorantim and Klabin. Votorantim Group is one of the largest
  • Tunnel essential to reduce congestion
    February 21, 2012
    Vietnam's Ho Chi Minh City's dense population, which was estimated to be 10,680 persons/km2 in 2005, is, over the next ten years, set to benefit from the completion of the Thu Thiem Urban Area project, which will provide homes for up to 200,000 people.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow