Skip to main content

Fehmarn Belt tunnel work to start in January

Construction of the large-scale tunnel element factory at Rødbyhavn can now start soon.
By David Arminas April 29, 2020 Read time: 3 mins
Rødbyhavn work harbour will be one of Denmark’s largest factories (image copyright Fermen A/S)

Construction of the immersed Fehmarn Belt road and rail tunnel between Denmark and Germany will start in January 2021, according to the project owner Femern.

The planned 18km tunnel under the Baltic Sea, between the Danish island of Lolland and the German island of Fehmarn, received approval from the European Commission last month. However, Germany still needs to give its final approval which is expected this autumn.

Dutch construction company BAM will receive a quarter of the €3.4 billion (US$3.92 billion) spent on a contract for the tunnel construction. Meanwhile, Dutch dredging companies Boskalis and Van Oord will receive €300 million each for the dredging of the tunnel. The tunnel is expected to be opened to traffic in 2029, according to a report in the Dutch newspaper Der Telegraaf.

Femern is in charge of planning and providing the basis for regulatory approval of the project on behalf of the Danish government. The framework for this work falls under a treaty between Denmark and Germany which was signed in 2008.

Femern said it is “activating the main construction contracts” with Dutch contractors’ consortium Femern Link Contractors from January 1, 2021.

“This means that construction of the large-scale tunnel element factory at Rødbyhavn can get underway,” according to a posting on Femern’s website. The work harbour is the gateway to the construction of the tunnel element factory, which will be will be one of the biggest factories in Denmark. From here the 73,000-tonne tunnel elements will be shipped out to the Fehmarnbelt – the strait between Fehmarn and Lolland.

Femern also said that it is already engaged in a number of construction site preparations for the tunnel on the German side at Puttgarden so that further progress can be made when Germany gives formal approval of the project.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Femern.

The Fehmarnbelt link will be user-financed. Revenues from the link will go to repay the loans that finance construction; the same model that financed the Storebælt and Øresund links. Denmark’s Parliament will decide the tolls and the operator Femern has said that there likely will be discounts such as weekend tickets, as is the case on the Øresund and Storebælt links.

Meanwhile, due to the spread of the COVID-19 virus, organisers of the Fehmarnbelt Days 2020 festival conference postponed the event that was to have taken place May 17. The Fehmarnbelt Days Secretariat said that an alternative date will be announced shortly. Since 2012 the Fehmarnbelt Days have dealt with key areas such as infrastructure, tourism, business, the labour market, transport and logistics as well as education and research.

For more information on companies in this article

Related Content

  • Denmark–Germany delay
    June 26, 2012
    The company handling the Fehmarnbelt tunnel project that will connect Denmark and Germany has confirmed that the project will now be delayed. Femern has revealed that construction will not start before summer 2015, a year later than originally planned. Denmark is expected to commence its environmental compatibility study in May 2013.
  • The tunnel connecting Denmark and Germany will now be delayed
    May 2, 2012
    The company handling the Fehmarnbelt tunnel project that will connect Denmark and Germany has confirmed that the project will now be delayed. Femern has now revealed that construction will not start before summer 2015, a year later than originally planned. Denmark is expected to commence its environmental compatibility study in May 2013.
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Planning Netherland's underground highways
    May 15, 2012
    The first agreements for Amsterdam’s proposed underground highway have now been reached. These have been made by the Dutch Minister for the Environment and Transport as well as Amsterdam local authority and the province of North-Holland. Under the agreed terms, the A10 highway will feature 12 lanes of traffic in four 1.2km tunnels under the capital, Amsterdam. The project will also include building metro and rail lines underground.