Skip to main content

Fayat reveals Compact asphalt plant at Intermat

Fayat’s development of the Compact asphalt mixing plant is to create a continuous flow of multipurpose product, including cold, warm and hot mix. Optimum energy management for mixing aggregates in the most effective way while the bitumen is hydrophobic is one criteria that the new plant offers, along with the ability to recycle materials according to typology. The feed is conventional and either into the tube via the ring, or into the continuous mixer, or both, for recycled materials. Bitumen is introduced
April 12, 2012 Read time: 2 mins
217 Fayat’s development of the Compact asphalt mixing plant is to create a continuous flow of multipurpose product, including cold, warm and hot mix.

Optimum energy management for mixing aggregates in the most effective way while the bitumen is hydrophobic is one criteria that the new plant offers, along with the ability to recycle materials according to typology.

The feed is conventional and either into the tube via the ring, or into the continuous mixer, or both, for recycled materials.

Bitumen is introduced into the Retroflux or Recyclean dryer tube, or into the mixer, far away from the flame.

Fayat said bitumen does not age prematurely because it is added to virgin aggregates or to virgin aggregates + RAP at the ideal controlled temperature.

With a direct feed into the mixer, Fayat has eliminated the risk of time lag, and guarantees correct bitumen dosage.

%$Linker: External 0 0 0 oLinkExternal <span class="mouselink">www.fayat.com</span> Fayat false http://www.fayat.com/ false false%>

Hall 3 Stand: C041

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Hidromek’s HMK200W wheeled excavator
    January 6, 2017
    Part of Hidromek’s crawler and wheel excavator range, the HMK200W wheeled excavator is designed with operator comfort, productivity, serviceability and safety in mind. It has a four-cylinder Isuzu engine, a top speed of 25.5km/h, a boom length of 5.8m, a 1m³ standard bucket capacity and a 21,800kg operating weight. The model has a dig depth of 5.93m.
  • Torque measurement device ensures firm foundations
    January 6, 2017
    Auger Torque has introduced a torque measuring device which fits between its auger drivers and the dipper end and measures the torque applied to screw anchors. A Bluetooth readout shows the torque applied enabling contractors top confirm they have achieved the minimum depth and torque requirements set by the civil engineer.
  • Torque measurement device ensures firm foundations
    April 18, 2012
    Auger Torque has introduced a torque measuring device which fits between its auger drivers and the dipper end and measures the torque applied to screw anchors. A Bluetooth readout shows the torque applied enabling contractors top confirm they have achieved the minimum depth and torque requirements set by the civil engineer.
  • Hidromek’s HMK200W wheeled excavator
    April 12, 2012
    Part of Hidromek’s crawler and wheel excavator range, the HMK200W wheeled excavator is designed with operator comfort, productivity, serviceability and safety in mind. It has a four-cylinder Isuzu engine, a top speed of 25.5km/h, a boom length of 5.8m, a 1m³ standard bucket capacity and a 21,800kg operating weight. The model has a dig depth of 5.93m.