Skip to main content

Fast pothole patching is possible with Fayat’s new Swift

The new SWIFT pothole patching machine from the Fayat Group is said to deliver fast road repairs that are long-lasting and durable. This all-in-one machine is equipped with a 2,000-litre capacity emulsion tank, a 4m3 hot-mix hopper, a pneumatic drill, a compactor, a 200litre water tank and a storage area for road signs. The firm says that the tools are easy to hold, and have been carefully positioned at the ideal height in boxes designed for this operation. All of the heavier items, such as the pneumatic dr
February 11, 2013 Read time: 2 mins
French firm Fayat's fast pothole patcher performs productively
The new SWIFT pothole patching machine from the 2779 Fayat Group is said to deliver fast road repairs that are long-lasting and durable. This all-in-one machine is equipped with a 2,000-litre capacity emulsion tank, a 4m3 hot-mix hopper, a pneumatic drill, a compactor, a 200litre water tank and a storage area for road signs. The firm says that the tools are easy to hold, and have been carefully positioned at the ideal height in boxes designed for this operation. All of the heavier items, such as the pneumatic drill and compactor, can be unloaded using a hoist. As a result, this versatile machine allows faster repairs of potholes, with a reduced risk of injury for personnel. And as the tools are all carried within the machine along with the necessary materials, it allows for more reliable road repairs that will be more durable.

Stand: F10.1008/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 51394 0 oLinkExternal www.fayat.com www.fayat.com false /EasySiteWeb/GatewayLink.aspx?alId=51394 false false%>

For more information on companies in this article

Related Content

  • Manitowoc increases its dealer service back-up
    January 6, 2017
    Manitowoc Crane Care is expanding its EnCORE dealer programme. Danish company UN Mobilkraner, which has worked with Manitowoc since 1994, now offers certified repair and refurbishment services for Grove mobile cranes in Scandinavia, under the Manitowoc Crane Care brand. To qualify for the program, dealers must invest considerable time in training technical staff, including advanced training for welders to earn the correct certifications for welding structural components on cranes.
  • Manitowoc increases its dealer service back-up
    January 28, 2013
    Manitowoc Crane Care is expanding its EnCORE dealer programme. Danish company UN Mobilkraner, which has worked with Manitowoc since 1994, now offers certified repair and refurbishment services for Grove mobile cranes in Scandinavia, under the Manitowoc Crane Care brand. To qualify for the program, dealers must invest considerable time in training technical staff, including advanced training for welders to earn the correct certifications for welding structural components on cranes.
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    January 6, 2017
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    April 9, 2013
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a