Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 17, 2013 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • ZF looks to combine hybrid module with cPower CVT transmission
    April 19, 2013
    ZF used bauma 2013 to show the next stage of development for its cPower continuously variable transmission (CVT). By combining the transmission with a hybrid module, ZF said greater operating efficiencies were available from the integration of start/stop technology and energy recovery from regenerative braking. Potentially, the hybrid drive system has the ability to boost fuel efficiency by up to 25% in addition to the 20% higher operating efficiency already offered by the cPower transmission, said ZF.
  • ZF looks to combine hybrid module with cPower CVT transmission
    April 19, 2013
    ZF used bauma 2013 to show the next stage of development for its cPower continuously variable transmission (CVT). By combining the transmission with a hybrid module, ZF said greater operating efficiencies were available from the integration of start/stop technology and energy recovery from regenerative braking. Potentially, the hybrid drive system has the ability to boost fuel efficiency by up to 25% in addition to the 20% higher operating efficiency already offered by the cPower transmission, said ZF.
  • XCMG to create R&D base in the United States
    January 6, 2017
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with
  • XCMG to create R&D base in the United States
    April 16, 2013
    Leading Chinese construction equipment manufacturing firm XCMG has revealed plans to open a new research and development facility in the United States. Speaking at bauma 2013 Wang Yansong, the company’s vice president, said, “In the second half of this year we are planning to build a R&D centre in the United States. It’ll take about half a year to finish construction. It should open in 2014.” While Yansong would not reveal how much XCMG was investing in the US site, he said it was due to America, along with