Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 17, 2013 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Doka’s DokaTruss table and Super Climber SCP on show at Conexpo 2014
    January 17, 2014
    Doka is inviting Conexpo 2014 visitors to take a look into the future of formwork technology – with the Austrian firm’s DokaTruss table and Super Climber SCP on show. A modular forming machine optimised for highrise cores, Doka says the new and improved version of the proven Super Climber SCP has been “rigorously developed”. In combination with DokaTruss table, a system aimed for setting and stripping large slab formwork, high speed construction cycles can, says Doka, be achieved efficiently. In the Comp
  • Saltec brand Torgar is offering innovative access solutions
    January 6, 2017
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • Saltec brand Torgar is offering innovative access solutions
    March 27, 2013
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s
  • JCB emissions compliant engines to launch in wheeled loaders
    January 6, 2017
    JCB will launch 427 and 437 wheeled loaders at Bauma, powered by Stage IIIB/Tier 4 Interim Cummins engines. First seen in prototype form at last year’s Intermat show, the two loaders are powered by the Cummins QSB6.7 engine, which offers a 9.4% increase in torque over the previous model. This drives through a lock-up converter and customers can choose a standard four-speed or optional five-speed transmission, which delivers a 16% drop in fuel consumption. In-cab noise levels have been reduced to just 68dB(A