Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 17, 2013 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Matest high production materials testing
    April 8, 2013
    Material testing equipment manufacturer Matest says its reputation for high production capacity, quality products, fast delivery times, and qualified technical support is acknowledged worldwide. The company offers advanced solutions for onsite and laboratory tests on bitumen, asphalt, concrete, cement, mortar, aggregates, rocks, soil, and steel, representing the ideal partner for anyone working in the construction and civil engineering industries. Its extensive range of material testing equipment is designe
  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • New technical centre boosts CMS Cepcor
    April 18, 2013
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • Element Six gives further boost to road pick life
    January 6, 2017
    Element Six is showing its second generation D Power road picks, which have been designed to give an even longer working life than the previous model. A new tougher steel surround has been developed to match the life of the polycrystalline diamond (PCD) tip. D Power road picks are now expected to give 50 times the overall life of standard machine milling picks, beating the figure of 40 claimed for the previous model. Synthetic diamond company Element Six is a member of the De Beers Group. Element Six’s mate