Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 17, 2013 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • German mining equipment sales reach record high
    April 16, 2013
    The German mining machinery market is at a record high, according to the German Engineering Federation, VDMA. Mining machinery manufacturers based in Germany hardly suffered from the financial crisis, said VDMA president Dr Thomas Lindner. Since 2007, their annual turnover has grown by about 13% on average. In 2011, growth was nearly 27% and turnover then increased by another 28% in 2012 to reach €6.2bn.
  • Gordie Howe Bridge progresses with community support money pledged
    June 18, 2019
    The Windsor-Detroit Bridge Authority and other agencies involved in the US$4.25 billion Gordie Howe International Bridge have pledged millions of dollars in community support. WDBA, contractor Bridging North America, the US state of Michigan and the federal Canadian government announced the support plan, which involves more than 30 agencies and organisations, according to a report by the Canadian Broadcasting Corporation. The plan includes a $15 million Neighbourhood Infrastructure Strategy for both s
  • CDE’s AggMax 83 logwasher gets an upgrade
    February 12, 2013
    Sitting alongside the M2500 mobile washing plant on CDE’s stand will be the latest AggMax 83 portable logwasher, which will include a RotoMax RX80 logwasher; triple- deck Prograde sizing screen and horizontal dewatering integrated on a single chassis. The AggMax has found many applications ranging from the washing of limestone conglomerate material in Scotland and Austria, to construction and demolition waste recycling in England, iron ore processing in India and sand and gravel washing in Germany.
  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w