Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 17, 2013 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Hyundai showcases its new 9A series excavators at bauma
    January 6, 2017
    Like its fellow new 9A series hydraulic excavators with engines above 130kW, the engine on the Robex R380NLC-9A hydraulic crawler excavator from Hyundai Heavy Industries (HI) comes with an EGR and diesel particulate filter (DPF). The DPF is said to be automatically or manually regenerated, ensuring compliance with all NOx and PM values. According to Hyundai HI, DPF filters only need to be cleaned after 5,000 to 6,000 hours in operation.
  • Hyundai showcases its new 9A series excavators at bauma
    February 13, 2013
    Like its fellow new 9A series hydraulic excavators with engines above 130kW, the engine on the Robex R380NLC-9A hydraulic crawler excavator from Hyundai Heavy Industries (HI) comes with an EGR and diesel particulate filter (DPF). The DPF is said to be automatically or manually regenerated, ensuring compliance with all NOx and PM values. According to Hyundai HI, DPF filters only need to be cleaned after 5,000 to 6,000 hours in operation.
  • Hyundai’s hydraulic hybrid offers 20% fuel savings
    January 6, 2017
    Hyundai Heavy Industries is showcasing a hydraulic hybrid machine at bauma. The R220-LC Hi-POSS is a 22tonne-crawler excavator with a system that allows brake energy to be used for other functions. Hi-POSS stands for Hyundai intelligent power optimal sharing and energy saving. “This is the most novel thing we have,” said Hyundai product engineer Joachim Van de Perre. “With a conventional excavator, when you brake, the energy heats the hydraulic oil. Here we use the energy to perform another task with the ma