Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 17, 2013 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap