Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 6, 2017 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Bar is high on Simpedil’s machine quality
    April 9, 2013
    Simpedil specialises in manufacturing bar cutting and bending machines for the concrete reinforcement industry. The firm’s 30 years plus experience and continuous machine development ensures high quality machines at all times. Simpedil also emphasises the company’s attention to pre and after sale support and its quality-price ratio. All Simpedil machines are also said to guarantee maximum efficiency and safety.
  • Bell launches high-manoeuvrability 4x4 ADT for narrow bench work
    April 15, 2013
    Bell has introduced a 4x4 version of its B30D articulated dump truck (ADT). The machine has the front chassis, cab and engine of the standard 6x6 but comes with a shortened rear chassis and a single axle. According to Neville Paynter, managing director of Bell UK, the machine’s short wheelbase reduces the turning circle by around 25%, making it ideal for use in underground mining and on narrow benches.
  • Fuller EmiControls on emissions
    March 27, 2013
    EmiControls new large turbine – the V22 – will be showcased at bauma 2013. The company, which began trading independently in 2012, offers mobile and stationary solutions for optimum dust emission control during demolition, recycling plant, quarry, mining and industrial-based applications.
  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.