Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 6, 2017 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Atlas dealers to add Effer cranes to their range
    January 6, 2017
    Crane dealers across the Atlas network will be able to add Effer cranes to the range of products they offer. Effer cranes will be sold, serviced and supported by Atlas dealers in different countries and particularly in Germany and the Middle East. The Atlas display at bauma features a new Atlas AK 955, built by Effer with Atlas colours and branding. Effer and Atlas began working together in the UK market in 2012. Success of the cooperation has led to its expansion worldwide. Atlas’s owner, Fil Filipov, said
  • Atlas dealers to add Effer cranes to their range
    April 15, 2013
    Crane dealers across the Atlas network will be able to add Effer cranes to the range of products they offer. Effer cranes will be sold, serviced and supported by Atlas dealers in different countries and particularly in Germany and the Middle East. The Atlas display at bauma features a new Atlas AK 955, built by Effer with Atlas colours and branding. Effer and Atlas began working together in the UK market in 2012. Success of the cooperation has led to its expansion worldwide. Atlas’s owner, Fil Filipov, said
  • Anaconda shows off screener and conveyor
    February 26, 2013
    Anaconda Equipment International will have two products on display at its first bauma: the DF410 tracked screener and a TR60 18m track-mounted stockpiling conveyor. The DF410 entry level screener can screen and stockpile up to 250tonnes/hour of material into three sizes, and is said to be ideal for those restricted by working area in urban areas.
  • Innovative pre-casting technology is available from PRENSOLAND
    January 6, 2017
    Spanish company PRENSOLAND seeks to push the boundaries of concrete pre-casting technology with its new machinery and equipment developments. Novel technologies are now being introduced what are said to be more versatile with regard to the size and shape of product as well as the manufacturing quality and mechanical properties.