Skip to main content

Far from formulaic

Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
January 6, 2017 Read time: 2 mins
Concrete dust accumulation can harden and cause operational and longevity issues, so be sure to clean the drill every day.
Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford

319 RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India.

The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on either side.  It is these approach spans that will feature RMD Kwikform shoring solutions.

RMD Kwikform’s ultra-heavy duty Megashor shoring has been chosen as the support system for the 32m high, 32m wide and 60m long main deck of the approach spans. Having to deal with local wind conditions, Megashor is also said to have the ability to cope with the dead weight of the deck itself.

A combination of Superslim, GTX Beams and specially designed crank soldiers are to be employed on the cantilever wing form, while the pier cap will be constructed using a Rapidshor system.

The bridge will be finished by the end of 2014, with RMD Kwikform completing its involvement in August 2013, just 13 months after starting work on the project.

Arul Raja, Vice President at RMD Kwikform India, said: “In supplying formwork and shoring solution to the Kota Bridge we have worked in partnership with construction firms Gammon India and 5739 Hyundai Engineering to deliver a bespoke solution in line with the project’s environmental considerations.
“RMD Kwikform’s involvement in a project of this significance further demonstrates its ongoing commitment to supporting large scale projects in India.”

Doka composite forming carriage is said to be meeting tough requirements for a four-lane road bridge on the B 243 Barbis Bypass over the River Oder in Germany’s Harz Mountains.

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Second giant moveable scaffolding system set for Mersey Gateway
    May 4, 2016
    A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.
  • Volvo strengthens German distribution with sale of Bavarian dealer
    January 6, 2017
    Volvo Construction Equipment (Volvo CE) has divested its wholly-owned dealership in south-east Germany, Volvo Baumaschinen Bayern (VBB), to neighbouring distribution partner Robert Aebi. The deal, for an undisclosed sum, includes the transfer of the company including all assets, employees and sales territory. The distribution in the south of the country, with Robert Aebi, now consists of a well-financed, independent and strategically aligned partner and this latest move strengthens Volvo CE’s competitive po
  • Volvo strengthens German distribution with sale of Bavarian dealer
    February 26, 2013
    Volvo Construction Equipment (Volvo CE) has divested its wholly-owned dealership in south-east Germany, Volvo Baumaschinen Bayern (VBB), to neighbouring distribution partner Robert Aebi. The deal, for an undisclosed sum, includes the transfer of the company including all assets, employees and sales territory. The distribution in the south of the country, with Robert Aebi, now consists of a well-financed, independent and strategically aligned partner and this latest move strengthens Volvo CE’s competitive po