Skip to main content

Eye-catching southern Italian bridge explosion (VIDEO)

The expertise of Nitrex Explosives Engineering were utilised recently for this eye-catching controlled explosion bringing down the Viadotto Ponte Autostrade Pecorone di Lauria (Lauria Junction viaduct) in Lauria, Potenza, southern Italy. Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.
July 1, 2013 Read time: 1 min
The expertise of Nitrex Explosives Engineering were utilised recently for this eye-catching controlled explosion bringing down the Viadotto Ponte Autostrade Pecorone di Lauria (Lauria Junction viaduct) in Lauria, Potenza, southern Italy.

Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.

Related Content

  • Mont Blanc Tunnel maintenance closure
    April 26, 2024
    The Mont Blanc Tunnel will be closed for maintenance.
  • VIDEO: Saskatoon bridge demolition removes final span
    November 18, 2016
    The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.
  • Canada: dump truck slams into bridge, partially demolishing it
    February 12, 2015
    In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
  • Geosynthetics stabilise differential settlement
    May 3, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and