Skip to main content

Eye-catching southern Italian bridge explosion (VIDEO)

The expertise of Nitrex Explosives Engineering were utilised recently for this eye-catching controlled explosion bringing down the Viadotto Ponte Autostrade Pecorone di Lauria (Lauria Junction viaduct) in Lauria, Potenza, southern Italy. Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.
July 1, 2013 Read time: 1 min
The expertise of Nitrex Explosives Engineering were utilised recently for this eye-catching controlled explosion bringing down the Viadotto Ponte Autostrade Pecorone di Lauria (Lauria Junction viaduct) in Lauria, Potenza, southern Italy.

Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.

Related Content

  • US$3.1 billion for US bridges and highways
    July 9, 2024
    US$3.1 billion of funding is being sought for US bridges and highways.
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.