The expertise of Nitrex Explosives Engineering were utilised recently for this eye-catching controlled explosion bringing down the Viadotto Ponte Autostrade Pecorone di Lauria (Lauria Junction viaduct) in Lauria, Potenza, southern Italy. Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.
      
  
           
                          
                July 1, 2013
              
            
                          
                Read time: 1 min
              
                    
                The expertise of Nitrex Explosives Engineering were utilised recently for this eye-catching controlled explosion bringing down the Viadotto Ponte Autostrade Pecorone di Lauria (Lauria Junction viaduct) in Lauria, Potenza, southern Italy. 
 
Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.
      
    Ice and salt had degraded the viaduct, necessitating a rebuild. A new viaduct will better withstand the snowy mountain climate of the Potenza region.
    
        
        


