Skip to main content

Extending the life of road assets

In an opinion piece published by the IRF, Matthew Jordan-Tank, head of infrastructure policy and IPPF, European Bank for Reconstruction and Development (EBRD) has explained that extending the functional life of road assets can be achieved using performance-based contracts. In most developing and merging market economies, roads require rehabilitation, or even reconstruction, many years prior to the expected date. Simply put: usable life is not equal to design life, and it is not uncommon to find that a ro
April 7, 2017 Read time: 2 mins
RSSIn an opinion piece published by the 3918 IRF Washington, Matthew Jordan-Tank, head of infrastructure policy and IPPF, European Bank for Reconstruction and Development (EBRD) has explained that extending the functional life of road assets can be achieved using performance-based contracts.

In most developing and merging market economies, roads require rehabilitation, or even reconstruction, many years prior to the expected date. Simply put: usable life is not equal to design life, and it is not uncommon to find that a road must be rehabilitated only halfway into its estimated original asset duration. While harsh climate conditions with large seasonal temperature changes may play a role, much of this 'premature' investment boils down to lack of systematic maintenance that is normally applied in countries with regular 'asset management' funding regimes.

Applying performance-based maintenance contracting to the road sector can produce significant fiscal improvements, as well as user benefits in the form of better maintained and therefore safer roads.

EBRD recently published a paper providing a condensed yet substantive overview of the key international lessons learned in the area of performance-based contracts.

For more information on companies in this article

Related Content

  • Outstanding quality management to Orgeon state Bridge delivery programme and Delcan
    July 20, 2012
    In 2002, bridge conditions in the State of Oregon were declining. Projections were made that 30% of Oregon's bridges would have weight restriction within 8-years, causing a productivity loss to Oregon's economy of US$123 billion including 88,000 jobs. By 2012, Oregon’s State Bridge Delivery Program had been recognized nationally and internationally with awards for excellence and innovation, most recently scooping IRF’s Global Road Achievement Award for Quality Management.
  • IRF tolling event planned for Malaysia
    July 6, 2016
    The IRF is planning a key course covering road tolling aspects. This course is intended to empower government agencies and other stakeholders to select optimum tolling solutions for projects. The IRF Washington is running the event in Kuala Lumpur, Malaysia on September 12th-15th 2016. The event is called; Navigating road user charging solutions. This course will assist government agencies and stakeholders in finding the best case solutions for the electronic toll collection (ETC) market. This market is
  • Belarus opts for a PPP road scheme
    August 12, 2019
    Belarus has started pre-qualification for what will be the country’s first public-private partnership – the M-10 motorway upgrade. David Arminas reports "There’s a little bit of almost everything in this project,” said Steve Gilpin, technical team leader and associate of engineers Ove Arup & Partners International. True to his word, there is. That was how Gilpin kicked off his presentation about Belarus’s planned M-10 motorway project to 180 international bankers, private investors, contractors and en
  • Asphalt reinforcement extends road life
    July 12, 2012
    Special reinforcements can extend the life of an old or new road, and also offer environmental benefits. Patrick Smith reports. Asphalt reinforcement can extend the service life of a resurfaced road by a factor of 3-4, says Huesker, developers of the HaTelit range of asphalt reinforcement. Aimed at preventing the propagation of reflective cracking from an old asphalt layer through a new surface course, Huesker claims the formation of reflective cracking is considerably delayed or even completely prevented u