Skip to main content

EV chargers to be deployed for London Olympic games

As part of a vision to make London 2012 Olympic and Paralympic Games sustainable, the London Organising Committee of the Olympic Games (LOCOG) has awarded a contract to ChargePoint Services (CPS) to supply and install GE DuraStation Electric Vehicle chargers and provide on-going after sales service support.
March 15, 2012 Read time: 1 min
As part of a vision to make London 2012 Olympic and Paralympic Games sustainable, the London Organising Committee of the 1558 Olympic Games (LOCOG) has awarded a contract to 3958 ChargePoint Services (CPS) to supply and install GE DuraStation Electric Vehicle chargers and provide on-going after sales service support.

CPS will supply 120 of GE Energy’s DuraStation electric vehicle chargers for the fleet of 200 1233 BMW and Mini electric vehicles that will be used to transport athletes and officials between venues during London 2012 as well as providing and operating the central management system software that will monitor and control the network of live charge posts. 

After the Games, the chargers will become part of London public electric vehicle charging infrastructure, delivering a lasting legacy and the growth of supporting electric car use in the British capital.

For more information on companies in this article

Related Content

  • Sandvik tunnelling equipment boosts Sochi 2014
    August 28, 2013
    Sandvik Construction is among leading equipment manufacturers playing a key role in building a network of road and rail tunnels on one new and one existing transport route in and around the Russian coastal city of Sochi as part of a US$47.75 billion investment in preparations for the Sochi 2014 Winter Olympics. Guy Woodford reports Sandvik Construction’s tunnelling equipment team in Russia have been very much in demand over the past three years. Since 2010, they have been overseeing the seven Russian c
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • Solving the Nation’s Roadwork Crisis with Greater Industry Collaboration
    December 31, 2024
    Nick Smee, Business Unit Director of Infrastructure at Causeway, discusses roadworks for the UK.