Skip to main content

Eurovia success in Hertfordshire, England contracts bid

Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts. The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.
October 11, 2012 Read time: 2 mins
3281 Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts.

The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.

Eurovia has also been selected as one of four companies for the Eastern Highways Alliance (EHA) of local authorities Framework, comprising the councils of Hertfordshire, Cambridgeshire, Suffolk, Norfolk, Luton, Bedford, Central Bedfordshire, Essex and Southend on Sea. The four-year framework deal started on 28 May 2012 and is expected to be worth up to $ 120 million (£75mn). Hertfordshire itself expects to put $ 6.4 million (£4mn) worth of work each year through the framework.
The works will be led by Eurovia Infrastructure from the company’s base in Enfield, North London.

Neil Huntington, Eurovia Infrastructure director, said: “The fact that we are the only company to be recognised in this way is a testament to the breadth of the in-house capability within Eurovia. It also recognises our reputation for quality, value for money and collaborative delivery which minimises disruption to local residents and businesses.”

For more information on companies in this article

Related Content

  • Kazakhstan’s London road show woos consortia for Almaty ring road
    March 2, 2015
    Kazak and EBRD officials visited London to highlight the possibility of a public-private partnership under the country’s revised PPP legal framework. David Arminas reports. To build a road, you go on the road, and that is what Kazakhstan did in London in mid-December. Representatives of more than 100 organisations, a mix of construction companies and financial institutions, attended the roadshow-style presentation to attract foreign capital for BAKAD, the Almaty Ring Road Concession. The message was that Ka
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Significant wins for Signify
    April 19, 2021
    Signify is transforming Gran Canaria’s most important highway, known as GC-1, into a smart highway with the company’s Interact City system
  • Siemens lights the way in Norfolk
    June 22, 2012
    A major programme to upgrade traffic lights at 78 junctions and 100 pedestrian crossings across Norfolk with new energy-saving LED signals from Siemens was set to finish this month. The retrofit project to supply, install and maintain all 178 sites is estimated to provide up to 78% power consumption and carbon savings for Norfolk County Council (NCC). The new contract includes an innovative cost benefit payback solution provided by Siemens Financial Services.