Skip to main content

Eurovia success in Hertfordshire, England contracts bid

Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts. The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.
October 11, 2012 Read time: 2 mins
3281 Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts.

The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.

Eurovia has also been selected as one of four companies for the Eastern Highways Alliance (EHA) of local authorities Framework, comprising the councils of Hertfordshire, Cambridgeshire, Suffolk, Norfolk, Luton, Bedford, Central Bedfordshire, Essex and Southend on Sea. The four-year framework deal started on 28 May 2012 and is expected to be worth up to $ 120 million (£75mn). Hertfordshire itself expects to put $ 6.4 million (£4mn) worth of work each year through the framework.
The works will be led by Eurovia Infrastructure from the company’s base in Enfield, North London.

Neil Huntington, Eurovia Infrastructure director, said: “The fact that we are the only company to be recognised in this way is a testament to the breadth of the in-house capability within Eurovia. It also recognises our reputation for quality, value for money and collaborative delivery which minimises disruption to local residents and businesses.”

For more information on companies in this article

Related Content

  • Flyover removal completed successfully
    February 15, 2021
    A flyover removal project has been completed successfully in the UK.
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Eurovia races against the clock for London’s Race of Champions
    June 17, 2016
    Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium. The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award. The circuit was co
  • Key Botswana road network gets an upgrade
    June 30, 2014
    Representing an investment of around US$113 million, Botswana’s A1 national road between Tonota and Francistown is undergoing a major upgrade This single-lane section is being progressively transformed into a north- and southbound dual carriageway, crossing four existing river bridges along the way. A strategically important transportation route for both Botswana and the southern African region, the A1 passes through Francistown, the nation’s second largest city, heading northwards to end at the Zimbabwe b