Skip to main content

EU agrees €600.65mn subsidy for Warsaw ring road

An EU subsidy of over €600.65 million (PLN 2.5bn) has been approved for the ring road project in the Polish capital Warsaw. The construction of the southern ring road is delayed as it was planned for the road to be ready in time for the Euro 2012. The whole project is valued at more than €1.031 billion (PLN 4.3bn). The road includes the S79 section between the Marynarska and Lotnisko junctions as well as the S2 section between the Pulawska and Kontpoie junctions. When ready, the road will ease the access to
May 2, 2013 Read time: 1 min
An 3287 EU subsidy of over €600.65 million (PLN 2.5bn) has been approved for the ring road project in the Polish capital Warsaw. The construction of the southern ring road is delayed as it was planned for the road to be ready in time for the Euro 2012. The whole project is valued at more than €1.031 billion (PLN 4.3bn). The road includes the S79 section between the Marynarska and Lotnisko junctions as well as the S2 section between the Pulawska and Kontpoie junctions. When ready, the road will ease the access to the airport and distribute the A2 motorway traffic around the capital.

For more information on companies in this article

Related Content

  • Tensar’s route to Euro 2012
    July 20, 2012
    Tensar International’s TriAx design solution has been used in the sub-base for the 17.9km Gdansk bypass in Poland. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters.
  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.
  • Slovakia’s Cabinet to have final say on D4 Bratislava bypass
    February 9, 2016
    The government of Robert Fico has said it will decide the fate of the controversial €1 billion Bratislava bypass, the D4 motorway project, possibly ahead of a national parliamentary election next month. Fico, who also was prime minister from 2006-2010, was re-appointed after leading his Direction Social Democracy party (SMER-SD) to a landslide victory in the 2012 parliamentary election. His party won 83 seats and formed an absolute majority government, Slovakia’s first since 1989. Controversy continue