Skip to main content

Environmentally friendly demolition of famous US Bay Bridge to take years

While the new eastern span of northern California’s Bay Bridge between San Francisco and Oakland will open to traffic this September, the task of taking down the old eastern bridge span roadway is likely to take years. Speaking to a local TV station Brad McCrea, regulatory director of the Bay Conservation and Development Commission, the state agency that oversees protection of the Bay Area, said: “Taking the old Bay Bridge [eastern span roadway] down is as practically as big a project as putting the new one
March 18, 2013 Read time: 2 mins
While the new eastern span of northern California’s Bay Bridge between San Francisco and Oakland will open to traffic this September, the task of taking down the old eastern bridge span roadway is likely to take years.

Speaking to local TV station KPIX 5 Brad McCrea, regulatory director of the Bay Conservation and Development Commission, the state agency that oversees protection of the Bay Area, said: “Taking the old Bay Bridge [eastern span roadway] down is as practically as big a project as putting the new one up.”

Environmental restrictions mean the existing structure will have to be carefully taken apart in sections, in the reverse order that it was originally built.

“They have great documentation about how this old structure was built in the 1930s. So they will use the architectural drawings from the 30s, they’ll use all of the photographs they have from the 30s, and they’ll use that as a road map to un-doing what was done 75 years ago,” explained McCrea in his TV interview.

The new eastern span of the Bay Bridge, a near 3km long continuation of the Bay Bridge crossing, will run on from a small island in the middle of the bay where the two suspension bridges of the western half make landfall. The route passes through this Yerba Buena Island, in a short tunnel.  A new single-span single-tower suspension bridge, with a 385m main span, is the centrepiece of the new eastern Bay Bridge span. It will cross the main east side shipping channel close to Yerba and its adjoining Treasure Island naval base, carrying five lanes of traffic each way. The road continues on the long curving Skyway concrete viaduct for the following 2.1km. A final touch down section takes motorists on to Oakland.

The US$6.3 billion renewal of the eastern Bay Bridge is seen as a long-term solution to renowned seismic activity in the area.

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Over 1/3rd of US bridges needing repair or replacement
    April 15, 2020
    Over 1/3rd of US bridges are needing repair or replacement according to a new report.