Skip to main content

Enel and ENI reach Italian electric vehicle charging station deal

Italian utility Enel has reached an agreement with ENI, the Italian oil and gas group, to boost the presence of electric vehicle charging facilities at petrol stations. Enel has already created a fast vehicle charging station that uses 43kW alternating current, providing a charge of up to 80% in about 30 minutes. The first charging stations will be delivered by March 2013 across ENI's 4,700 petrol stations.
January 4, 2013 Read time: 1 min
Italian utility Enel has reached an agreement with 7068 ENI, the Italian oil and gas group, to boost the presence of electric vehicle charging facilities at petrol stations.

Enel has already created a fast vehicle charging station that uses 43kW alternating current, providing a charge of up to 80% in about 30 minutes. The first charging stations will be delivered by March 2013 across ENI's 4,700 petrol stations.

For more information on companies in this article

Related Content

  • Emissions legislation update
    July 20, 2012
    World events are driving the new focus on fuel economy for diesel engine development Spiralling fuel prices have put a new spin on technological developments in the engine and driveline sector. Recent legislation has been pushing manufacturers to develop cleaner running engines that are quieter and offer drastic reductions in exhaust emissions. For the engine and driveline manufacturers, research and development aimed at reducing engine fuel consumption is in hand but the market conditions have placed fresh
  • Weigh in motion technology reduces road damage
    February 8, 2012
    Overweight vehicles cause enormous damage to road structures but they can be caught, even at high speed. Weigh-in-motion or WIM devices are designed to capture and record axle weights and gross vehicle weights as vehicles drive over a measurement site.
  • Material transfer vehicles for Poland
    April 1, 2014
    Roadtec Shuttle buggies are now being used on major road projects in Poland. This follows a decision made by the Polish road authority, GDDKIA, to use material transfer vehicles on highway projects. The need for a smooth running surface is paramount on highways as in Poland these tolled links can allow speed limits of up to 140km/h. This is why GDDKIA decided the use of a material transfer vehicle was crucial to optimising mix delivery into pavers, so as to help optimise surface finish.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b